Your energy label and the renovation obligation
Your energy label shows how energy efficient your property is. Setle shows the label today and the label after each step of your plan. Setle also checks whether your plan reaches the label your region requires.
What do the label and the number mean?
The number in kWh/m² per year tells you how much energy your property needs per square metre in a year. It’s a calculation based on standard use, not a measurement of what you actually use. The lower the number, the more efficient your property. The label follows from that number.
You see the label in 3 places:
- in your list of properties
- on the Plan tab, at Today and after each step
- on the Results tab, under Estimated energy label
Didn’t add an EPC? Then Setle calculates the label itself from your answers about your property. The label then shows Calculated by Setle. You only see the number at Today when your label comes from an EPC.
A calculated label and the label after renovation are estimates. Read whether the report is an official EPC.
The limits per region
Each region has its own limits. The same number can give a different label in Flanders, Brussels or Wallonia. These are the limits in kWh/m² per year:
| Label | Flanders | Brussels | Wallonia |
|---|---|---|---|
| A++ | doesn’t exist | doesn’t exist | 0 or less |
| A+ | 0 or less | 0 or less | up to 45 |
| A | up to 100 | up to 45 | up to 85 |
| B | up to 200 | up to 95 | up to 170 |
| C | up to 300 | up to 150 | up to 255 |
| D | up to 400 | up to 210 | up to 340 |
| E | up to 500 | up to 275 | up to 425 |
| F | more than 500 | up to 345 | up to 510 |
| G | doesn’t exist | more than 345 | more than 510 |
Which obligation does Setle check?
Setle compares the label after your plan with the obligation in your property’s region:
- Flanders: are you buying a property with label E or F? Then you must reach at least label D within 6 years of the purchase. The report mentions a fine of up to 5,000 euros if you don’t.
- Brussels: every property must reach at least label E by 1 January 2033 and label C by 1 January 2046.
- Wallonia: the region plans a timeline in which every property must score better step by step, also when you’re not buying or selling. Setle already checks your plan against these steps:
- label F by 1 January 2031
- label E by 1 January 2036
- label D by 1 January 2041
- label C by 1 January 2046
- label B by 1 January 2050
Does your plan meet the obligation?
On the Plan tab, you see after which step your property reaches the required label. That step shows “Target achieved!”. Below it, you see the Budget to achieve this target: what the works up to and including that step cost.
Does a step reach a label that’s only required later? Then it shows “Milestone reached!”.
The renovation check in your report
Your renovation report sums it all up in the renovation check, for example the EPC renovation check for a property in Flanders. You get one of these outcomes:
- “Congratulations”: your property already complies. Your plan makes it even more efficient.
- “With this investment, you reach label”: your plan meets the next obligation. The report names the label and the deadline. Do you already meet an earlier deadline? Then it says so too.
- “Unfortunately”: your plan doesn’t reach the required label. Add works from the catalogue or put removed works back in your plan. Then check on the Plan tab whether “Target achieved!” appears.
Want to know what else your results show? Read how to read your results.